Infrastructure Visakhapatnam Steel Plant



panorama view of vizag steel plant



the prepared coal charge in coal tower drawn charging car on top of batteries , charged ovens per sequence. charged coal gradually heated heating wall of oven in absence of air attain temperature of 1000°-1050 °c @ central axis of coke mass toward end of coking period. coking period specified between 16 hrs , 19 hrs depending on oven condition , production requirement. volatile matter of coal liberated during carbonization collected in gas collecting mains in form of raw coke oven gas passing through stand pipes , direct contact cooling ammonia liquor spray. gas cooled 800 °c drawn coal chemical plant exhauster. residual coke pushed out of oven pusher car through guide coke bucket. red-hot coke taken coke dry cooling plant cooling.there 4 batteries, each having 67 ovens each. each oven can hold 32 tons of dry coal charge. volumetric capacity of each oven 41.6 cum heat carbonation supplied under firing of coke oven gas having cv of 4200 kcal/nm3 of mixture of bf gas & co gas having 900 kcal/nm3. heating system of batteries of under jet, compound type having twin-heating flues re-circulation of waste gases.







Comments

Popular posts from this blog

1940-1941 Pontiac Torpedo

1920–1923 List of 1920s jazz standards

Sovereign Building Zollinger-Harned Company Building